What Is the Process of Bushing Manufacturing?
A bonded rubber-to-metal bushing is made by molding and curing rubber against prepared metal parts. The main steps are rubber mixing, sleeve preparation, coating, molding and curing, finishing, and checks. The work starts with an agreed design. Each step helps control the part’s size, rubber properties or bond.
This article covers solid rubber-to-metal bushings used in vehicle suspension. Bronze sleeve bearings, loose rubber inserts and fluid-filled hydraulic bushings use other production routes. In the bonded design covered here, rubber is shaped and bonded to prepared metal. It is more than a rubber ring pushed into a tube.
Knowing the steps helps a buyer review a sample. A neat surface shows only part of the result. The drawing, rubber specification, bond checks and tests of the whole part answer different questions.

Start With the Bushing Design
A common bonded suspension bushing has an inner tube, an outer sleeve and rubber between them. The metal parts provide the mounting points. The rubber flexes as the suspension moves, while the bond connects it to the metal. The drawing shows which surfaces are bonded and how the part fits in place.
Before making tooling or samples, confirm the vehicle use, mounting position and drawing version. Check the bore, outer diameter and length. The drawing may also show flanges, gaps in the rubber, offsets or marks that show which way the part faces. Read these features together rather than copying only the outside of a used part.
A worn sample can help match a part number, but its rubber may have changed shape. It may also have rust or damaged edges. Use it to start the discussion, then agree the size and targets for the new part. For a control arm, browse the GSW control arm bushing range and confirm the exact part needed.
The Bushing Manufacturing Process, Step by Step
1. Select and Mix the Rubber Compound
The rubber compound is the mix used to make the flexible body. The producer selects the base rubber and other ingredients, then weighs and mixes them into uncured stock. Mixing spreads the ingredients through the rubber before it is shaped.
At this stage, ask whether there is a clear material specification. A rubber type or hardness value alone leaves gaps. Discuss heat, fluids or outdoor exposure where these matter, along with the properties the part needs to meet.
Keep the rubber batch marked through the next stages. A sample or test record can then be traced to the rubber used.
2. Prepare the Metal Sleeves and Inserts
Metal sleeves may be cut from tube, formed or machined to suit the design. They are made to the required shape and size before bonding. Burrs—small sharp ridges left by metalworking—are removed where needed.
Check the sleeves against the approved drawing. The outer sleeve must fit its housing as intended, and the inner bore must suit the mount. Deal with damaged inserts and unwanted sharp edges before molding.
Confirm the finish needed on exposed metal. A coating used there may not suit the bonding area. Those surfaces have different jobs.
3. Clean and Prepare the Bonding Surfaces
The bond needs a prepared surface. Degreasing removes oils left by earlier work. The chosen surface treatment then prepares the metal for the bonding system. Oil, loose residue or dirt should not be left between them.
The route may use mechanical or chemical treatment to suit the metal and bonding system. In its rubber-lining examples, the UK Health and Safety Executive’s rubber-processing guidance describes degreasing and abrasive preparation before bonding. The method for a suspension bushing still needs to be defined for that part.
Handling matters after cleaning, too. The process plan should explain how the prepared surfaces are kept clean before coating. When reviewing a sample, ask what surface condition is needed and how it is checked. A photo of a clean-looking sleeve cannot show that full process.

4. Apply the Specified Bonding System
A bonding agent is applied to the intended metal surfaces. The coated inserts are dried and handled as the process requires before molding. The agent and the way it is applied must suit the rubber, metal and cure being used.
This step links surface preparation to molding. A visible coating shows coverage. It does not prove that the surface, bonding agent and cure will create the required bond. More coating cannot make up for the wrong process.
For the part being quoted, ask how the supplier tracks the bonding material and controls its use. Review the effect of any change to the approved combination. Buyers need to understand these controls without asking for a secret formula.
5. Mold the Rubber and Control Vulcanization
The prepared metal parts are placed in the mold. A measured amount of rubber is loaded or fed into the mold cavity, depending on the process. It takes shape around the inserts under the set molding conditions. The inserts must sit in the right place, and the rubber must fill the intended space.
Molding gives the rubber its shape. Vulcanization, also called curing, forms links between the rubber’s long molecular chains. These cross-links help give it its working elastic properties. Shaping and curing often happen in the same heated mold cycle, rather than at two separate stations. The World Bank Group’s rubber manufacturing overview describes mixing, forming and vulcanization, including bonded vehicle suspension products.
In this route, the rubber cures against the prepared, coated inserts to form the bonded part. The settings must be worked out for that rubber mix and design. A heat setting or cycle time used for one part cannot simply become the target for another.
Check how the supplier tracks the key settings and responds when a cycle falls outside the agreed limits. A machine setpoint shows the intended value. A record linked to the batch helps show what was tracked as the parts were made.

6. Finish the Molded Assembly
After the set cycle, the part is taken from the mold and follows the approved finishing route. Excess rubber at the mold’s parting lines is called flash. It is trimmed where needed, while keeping the intended rubber shape and metal surfaces intact.
Some designs need more work after molding. This may be a further treatment, an assembly step or a controlled change in size. Include such steps when the design and process call for them. One bushing’s construction does not set the route for every other part.
Compare the finished shape with the drawing and approved sample. Check edges, openings and marks that show the part’s direction. Also check areas where trimming could cut away rubber that should remain.
7. Inspect and Release the Batch
Inspection checks the finished part against the agreed requirements. Start with its appearance and key dimensions. The plan should also name the rubber, bond or whole-part tests needed for its use. Set out how many parts to check and what counts as a pass.
Each result needs to name the part number, drawing version, sample or batch, and test method. A report for a similar-looking product may not cover the part being ordered.
Release the batch under that agreed plan. If a result falls outside a limit, define how to mark and deal with the affected parts. This keeps sample approval, batch checks and shipping records tied to the same specification.
For size checks, use gauges suited to the bore, outer sleeve and overall length shown on the drawing.

What Should Buyers Verify Before Production?
Use the process steps to ask clear approval questions. Each check has a job. Measuring a diameter confirms size; it does not show how well rubber sticks to metal.
| Check | What it helps show | What to agree for the part |
|---|---|---|
| Drawing and dimensions | Whether the measured features match the design | Drawing version, key sizes, allowed limits and measuring method |
| Rubber hardness | Resistance to a test tip pressing into the rubber | Method, scale, suitable sample and allowed range |
| Rubber-to-metal adhesion | How the bond behaves in the chosen test | Test method, sample or part setup, and pass limits |
| Whole-part response | How the part responds to a set load or movement | Fixture, load direction, test conditions and required result |
ASTM D2240’s hardness overview describes indentation: how a test tip presses into a material. It also explains the limits of relating hardness to other properties. Use hardness as one rubber check. Ask for separate evidence of bond strength or how the whole part responds to load.
ASTM D429’s adhesion methods address the bond between rubber and a rigid surface. Its public overview explains that comparing production parts depends on being able to make suitable test samples. Agree a method that fits the part and the question being asked. Naming a standard alone does not define a pass limit.
For a new sourcing program, organize approval in four steps:
- Define the part. Confirm the original equipment (OE) number or drawing, vehicle use, mounting position and drawing version. Resolve differences between the sample and the intended new part.
- Agree the evidence. Name the size, rubber, bond and whole-part checks needed. Record the methods, conditions and pass limits before testing.
- Review the sample file. Match the sample and reports to that part number. List any targets that have not yet been checked. A partial report is not a complete approval.
- Connect approval to repeat orders. Agree how batches are marked, what release records are supplied and which proposed changes need review.
Select the checks for the part and its intended use. Keep each result within its scope. A rubber test or laboratory result is not a guarantee of life on a vehicle.

Prepare a Bushing Inquiry for GSW
Use the GSW rubber bushing range to find the right product family. Then send the details needed to discuss the part:
- OE number, vehicle make, model and year, plus the mounting position.
- Drawing version and key dimensions, or a marked sample when no drawing is available.
- Rubber and performance targets already defined for the part.
- Expected order quantity by part number and destination market.
- Packaging, labeling and timing needs that affect the order.
For an uncertain or custom part, explain what the sample represents and what still needs to be checked. GSW can then discuss the product against a clearer brief. Sample and inspection needs can be agreed for the part being quoted.
Before approving production, connect three things: the defined part, the approved sample and the evidence needed for the supplied batch. This gives the buyer a clear way to review each part number.
References
- Environmental, Health, and Safety Guidelines for Metal, Plastic, and Rubber Products Manufacturing — Explains the general rubber-processing stages and the role of vulcanization.
- Introduction to rubber processing and safety issues — Illustrates why metal preparation comes before applying a rubber-bonding system.
- ASTM D429 — Standard Test Methods for Rubber Property—Adhesion to Rigid Substrates — Defines the scope and specimen limits of rubber adhesion testing.
- ASTM D2240 — Standard Test Method for Rubber Property—Durometer Hardness — Clarifies what an indentation-hardness result measures and its limits.






